Today was the first official meeting of the semester. Nick began the night by laying out the time line for this semester. We now have tentative deadlines by which we should have different aspects of the build completed, including having a fully functional vehicle. Once the formalities were taken care of, the electrical team moved to the electronics lab to continue their many projects, while the rest of us prepared for another shift of manual labor.
Tim briefed us on the work for the night. 3 different tasks were in need of being accomplished and soon everyone was at work. Abe, assisted by Tim, Nick, and Alex began drilling holes in the plug for a ventilation system. Mitch, Megan, and Mike began tearing the old table apart so that they can build 2 smaller, portable tables for moving the plug around the shop. I worked on the spray booth and it is now ready to be installed.
Bronco Pride,
Joshua